Repairs and cleanup continue after Upper West Side water main break

ByEyewitness News WABC logo
Tuesday, January 14, 2020
Crews continue to repair water main on Upper West Side
Some residents remain without water due to the water main break.

UPPER WEST SIDE, Manhattan (WABC) -- Work continues Tuesday to clean up and repair the massive water main break that flooded streets, buildings, and subways on the Upper West Side.

The several feet of water had receded by Monday night, when crews dug a hole to get to the 98-year-old water main that caused all that trouble.

The main broke early Monday morning, shutting down subway service ahead of the morning commute.

1 of 9
A water main break flooded several streets on the Upper West Side Monday, causing disruption to subway service.
WABC

By the afternoon, the MTA cleared water from the tracks to get trains running again. But the flooding is still causing problems in nearby buildings, and some residents still do not have clean water.

The flooding inundated an underground parking garage, destroying as many as 50 cars.

Many nearby restaurants also had to shut down because the water was shut off.

Fire officials speculated that the recent fluctuation in temperatures could be to blame, although a cause for the break has not yet been determined.

Broadway southbound will be closed in the area of the water main break for at least a few days, although the northbound side of the avenue will remain open, as will the sidewalk.

Some parts of Columbus Avenue and surrounding side streets may be closed periodically for repairs.

----------

* More Manhattan news

* Send us a news tip

* Download the abc7NY app for breaking news alerts

* Follow us on YouTube